Friday, August 22, 2008

8/17/08 update revised





What Forrest did

Booth: (see pics) forrest installed the doors with temporary latches

Chapel: couldn't get to it this week

Storage room: We'll get to it

Amps: not yet

Tuesday, August 19, 2008

8/17/08 update

Actual Crew

1st Service

Sound: Donn
Lighting: Donn
Media Shout: Jason
Video: Nathan

2nd Service

Sound: Donn
Lighting: Donn
Media Shout: Jason
Video: Nathan

What happened: 

1st service: everything went real well

half time: we lost power to all lights in sanctuary, video was fine
reason: the breaker flipped that controls a bunch of panels, fortunately all video was on an independent system.

2nd service: everything was fine

This week:

Amps: swap out two amps to change their circuit boards
who: Donn and Forrest

Breaker Panel: Forrest and Terry to go through panel and make sure no wires have chewed on, so that we don't lose power again.

Booth: 1. Rack: install faces and will talk to committee about locks and such
who: Forrest is doing a great job
     2. Video extension: Probably next week
who: Forrest
     3. Drawer substitution: Toolboxes probably next week
        who: Nathan, Donn, Brandon, Forrest

Storage Room: still need to test everything

Chapel: 1. Cd Recorder: rewire to aux
who: Nathan
      2. Carpet floor in booth
        who: Nathan
      3. Homes for the batteries and Mic's
        who: Nathan 

Friday, August 15, 2008

8/10/08 update revised

What we got done

Booth:
1. Forrest is done building faces for racks but won't install them till we have keys for those who need keys
2. video extension: We'll build a box to put the table on next month sometime, upcoming weeks are too booked with stuff for Forrest.  It will be done though.
3. Drawers: Forrest came up with an alternative for these, we will now have another toolbox for our things we need to have in the rack.  We'll take care of this in the upcoming weeks.

Amps: they came back from repair only to learn that their circuit boards all need to be changed out with more updated ones. Forrest and Donn will swap two out per week until we have it.

Chapel:  didn't have time for anything this week
1. I will rewire the CD recorder to an aux this next week and work on getting everything else done there too.


Sunday, August 10, 2008

8/10/08 update

Actual Crew

1st service
Sound: Brandon, Donn
Lighting: Brandon, Donn
Media Shout: Ray
Video: James

2nd Service
Sound: Brandon, Donn
Lighting: Brandon, Donn
Media Shout: Diane
Video: James

What Happened

Over all a really good two services according to Brandon


To Do this week

Booth:
1. get rack shelves and drawers
2. forrest to hopefully install locks and close up racks
3. Hopefully build addition to extend video side
Storage Room:
1. test whatever we can and inventory

Chapel:
1. home for mic's and batteries
2. carpet the floor
3.drawer also needed over there for the rack

if you can help let donn know or if you have ideas, those are always welcome

Friday, August 8, 2008

8/3/08 update revised

What we got done?

Booth: 
1. talked to Forrest and Donn, we'll make a box in the upcoming weeks for the expansion.   Skip said we will remodel the booth next year sometime.

Storage Room: we're gettin there

Chapel: we're gettin there too


Monday, August 4, 2008

8/3/08 update

Actual Crew

1st Service
Sound: Brandon, Randy
Lighting: Brandon, Randy
Media Shout: Jason
Video: James

2nd Service
Sound: Brandon, Randy
Lighting: Brandon, Randy
Media Shout: Jim
Video: James

What happened

For the most part everything went really smooth in all positions.  Until half time began and the band decided to change there levels on stage which left Brandon unable to remix everything, due to an increase in stage volume.

The person's title on the testimonies should be on longer.  Nathan will take care of this


Things to do this week:

Booth:
1. make faces and locks for both audio and video racks
who: Forrest has got everything and will do this week
2. get more shelves and drawers for the racks
who: Donn and Nathan will take care of this hopefully
3. investigate Jim's idea of extending the booth (great idea Jim).  Jim's idea is to take a another table put it at booth height, on the left side and move the video area onto that, not much weight, but we just need to investigate long term possibilities.  Instead of a table a more solid block or something. It's just getting tight between media shout and video right now.
who: Donn, Forrest, Nathan, Brandon will look into this

Storage Room:
1. go through and test everything, so we know what we really have
who: i have no idea, we'll get to it though (on going project)

Chapel:
1. home for batteries, Mic's
2. carpet the floor
3. drawer for the rack
who: don't know yet



Friday, August 1, 2008

7/27/08 update revised

What happened this week?

Amps: both amps were taken to service
Status: Forrest took care of this

Aviom: taken into service
Status: Forrest took care of this

DVD Player: send it back to Sony
Status: Nathan took care of this

Booth:
1. found white wood box to raise mic receivers up
2. Media Shout was still crashing on Friday, so Nathan and Debbie upgraded to a new build, so far no more issues

Storage room:
1. organized and went through stuff on Wednesday (Nathan and Brandon)
2. Everything is in a practical spot